Airside 1 Hub Skylight Addition, OIA

Building Enclosure Consulting Services
Orlando International Airport
Orlando, Florida

Gale personnel initiated the project by reviewing existing drawings and specifications and performing field evaluations of the existing conditions. Roof measure ups and verification of existing components were documented and noted in the construction documents.

Subsequent to Gale’s field evaluation, Gale prepared roof replacement design, roof augmentation details and specifications for inclusion into the overall design package. Gale also assisted with the design and coordination of waterproofing details of the new HUB skylight addition and helped established the protocol for testing and verification of building enclosure components.

Gale provided construction period services by reviewing the submittals and shop drawings for all building enclosure components and performing periodic quality control site visits. Gale also observed testing and verification procedures of building enclosure components and provided detailed quality control inspection reports during construction as well as assisted with building enclosure close out documents.